/file/attachments/orphans/ATB-Cranes_552831.jpg)
AFTER THE BELL: Durban port’s crane crisis threatens SA’s private sector logistics drive
By Stephen Grootes
As cargo backlogs deepen at Durban Gateway Terminal, freight costs are soaring, supply chains face disruption and shipment company ICTSI risks losing the trust needed to fix the port.
This story was published by Daily Maverick. Read the full article on their site.
Read the full story at dailymaverick.co.za(opens in a new tab)/file/dailymaverick/wp-content/uploads/2021/10/daily-maverick-social-masthead.png)






